Waterworks and realignment of water courses
Channel Údoč and related channels within VSN III., reconstruction
Completion date: 2004The structure is classified as a line construction and divided into individual integrated structures. The project involved the reconstruction of the Dolný channel, connection of the Udoč channel, reconstruction of the inverted siphon of the gas pipeline, conversion of the box culvert and bridging, construction of a feeder channel to the Pavlovce – Vojany pumping plant, and a bridge over the channel.
Jarovnice – realignment of the Malá Svinka brook
Completion date: 2003The construction project is situated in the village of Jarovnice and resolves realignment of the Malá Svinka brook that was damaged by a flood. The realignment of the brook involved preparatory works, water bed adjustment, creation of fords, points of access to the brook, entries on both sides, relocation of a low-voltage line, telephone line, and the municipal radio wiring.
Realignment of Malá Svinka – Uzovské Pekľany
Completion date: 2002The construction is situated in the Bachureň mountain range, in the village of Uzovské Pekľany. The construction was built after a flood and reinstated to the original condition. It mainly involved earthworks leading to compaction and adjustment of the brook bed and banks. The project involved also the construction of a levee.
Realignment of the Torysa river in Brezovice
Completion date: 2002The construction project is situated in the village of Brezovice. The project involved realignment of the river bed between 102,04 and 104,16 km, compaction of banks with aggregates, which was followed by ground levelling between 102,6 and 102,697 km where slopes were replaced by supporting walls. The river bed bottom is fixed by stabilizing stone sill. Fords were built at 102,978 and 104,130 km, points of access to the river bed were built at 102,284 km on the left bank and at 102,611 km on the right bank.